Electric Transportation Partners

Express 250

DC fast charging for public sites and fleets.

62.5 kW standalone

CCS1 and CHAdeMO; an optional NACS cable upgrade replaces CHAdeMO.

View specifications ↓Ask ETP about Express 250
ChargePoint Express 250 charging station

Specifications

Example: One full-output station · North America

Change configuration
Express 250 · North American electrical requirements
Supply480Y/277 V grounded WYE, three-phase, 60 Hz; delta unsupported
Maximum AC input80 A per full-output station
Manufacturer breakerOne dedicated 100 A breaker
DC charging outputUp to 62.5 kW to one vehicle
Station conductorsL1, L2, L3 and equipment ground; no operating neutral

A standalone station charges one vehicle at a time. Actual charging speed also depends on the vehicle and site power limits.

Mounting
Freestanding.
Cable reach
12 ft 4 in to a typical vehicle charging port; 14 ft full swing-arm reach.
Connectivity
LTE cellular for the cloud connection; Wi-Fi for local communication.
Required services
ChargePoint Cloud, Activation and Commissioning are sold separately. Commissioning is the station’s final setup and testing.

For pricing or help choosing equipment, send ETP a project inquiry → Plans or photos can be attached.

Foundation, clearance and wiring requirements are covered in the manufacturer guides linked on this page.